The closure points
The detail sheets show the local signing, junction arrangements and works access around the closures. This gives reviewers a closer view of each location.
Design services
A coordinated design showing the closure arrangement, proposed diversion and the information road users need along the route.
Questions about this serviceDesign scope
Your brief
Tell us the exact closure limits, dates and hours, required access and any proposed diversion. We will discuss route constraints and authority requirements. Permit and traffic-order applications are separate from drawing preparation unless expressly agreed.
See the design brief checklistWhat you receive
Drawings are issued as PDF files. The quotation identifies the deliverables, assumptions, agreed programme and any supporting design risk information required for the scheme.
If additional mapping or OS data needs to be purchased, the cost is agreed by email first. Site visits are available on request.
Let us know your drawing deadline as well as the works dates. Urgent requests are subject to availability; any short-turnaround or out-of-hours uplift is agreed before acceptance.
Road closures & diversions
Two detailed closure layouts and an associated diversion overview show how the individual arrangements connect to the wider route. Each sheet can be opened separately, or viewed together in one PDF.

Reading this example
The detail sheets show the local signing, junction arrangements and works access around the closures. This gives reviewers a closer view of each location.
The overview shows how the diversion links around the closed road, including signs at the junctions where drivers need to change direction.
References on the overview point back to the two detail sheets. Reading the sheets together connects the local arrangements to the complete diversion.

Sheet 01
The first closure layout, with advance signing, local arrangements and the adjoining slip-road detail.
Open sheet 01
Sheet 02
The second detailed layout, showing the closure arrangements, traffic routes and works access.
Open sheet 02
Sheet 03
The wider diversion route, its signing and references back to the two closure-detail sheets.
Open sheet 03Illustrative examples with title blocks removed. These extracts are not for site use.
Before you enquire
You can send a proposed route if you have one, but you do not need to have it settled before enquiring. Share the closure limits, dates and known route constraints so we can discuss the design requirements.
That depends on the detail needed. A scheme may use a diversion overview with separate closure-detail sheets, as shown in the example. We agree the drawing package before work starts and issue it as PDFs.
Tell us which properties and entrances are affected and what access is required during the works. We will review these needs against the closure limits and available routes, and discuss any constraints with you.
Permit and traffic-order applications are separate from drawing preparation unless expressly agreed. Tell us who is coordinating them and share any authority requirements that need to be reflected in the design.
Send the location, a short brief and your dates. We’ll confirm the scope, fee and drawing delivery date before work starts.