Advance warning
The extract shows roadside signs and motorway signals along the approach. Notes identify the signal sequence as a matter for coordination with the control centre.
Design services
Temporary traffic management design for motorway and dual-carriageway schemes, from focused closure layouts to coordinated arrangements across works phases.
Questions about this serviceDesign scope
Your brief
Include the route, direction, junctions or marker post limits, working space, proposed dates and any National Highways or client requirements. Share existing drawings and available cross-section information by email when requested.
See the design brief checklistWhat you receive
Drawings are issued as PDF files. The quotation identifies the deliverables, assumptions, agreed programme and any supporting design risk information required for the scheme.
If additional mapping or OS data needs to be purchased, the cost is agreed by email first. Site visits are available on request.
Let us know your drawing deadline as well as the works dates. Urgent requests are subject to availability; any short-turnaround or out-of-hours uplift is agreed before acceptance.
Lane closure / Design extract
A draft layout prepared to National Highways specification for Signalling for Roadworks (SfR), coordinating advance warning signs, the closure and works access and exit points.

Reading this example
The extract shows roadside signs and motorway signals along the approach. Notes identify the signal sequence as a matter for coordination with the control centre.
Successive plan sections follow the lane three and lane two closure along the carriageway, using marker post references to identify the location.
Entry and departure points are shown within the closure layout. The accompanying notes identify matters that need further review for the works.
These extracts illustrate drawing presentation. They are not installation drawings for another site; final arrangements are subject to the relevant project review.
Before you enquire
Include the road number, direction of travel, nearby junctions and marker post limits if available. A clear location helps us establish the extent of the drawing and its relationship to adjoining junctions.
Yes. Explain how the working area changes between phases and provide the proposed programme. We will agree the layouts and drawing issues needed for each stage.
Yes. Tell us where works vehicles need to enter and leave, along with any restrictions or arrangements already agreed with the project team. Access and exit requirements are considered with the closure layout.
Send the latest available drawing, its revision and the changes required. We will review the information and confirm whether it provides a suitable basis for the agreed work. Drawings are issued as PDFs.
Send the location, a short brief and your dates. We’ll confirm the scope, fee and drawing delivery date before work starts.