Four approaches
The layout brings the four signal-controlled approaches into one view, including where traffic waits and how each approach is signed.
Design services
Practical temporary traffic management drawings for road and street works, with the layout selected around your site, working space and access needs.
Questions about this serviceDesign scope
Your brief
Tell us where the works are, the space needed and which accesses must remain available. Add the road speed if known; if it is not supplied, we will establish it from reliable sources. Signal and other authority requirements are confirmed for the scheme.
See the design brief checklistWhat you receive
Drawings are issued as PDF files. The quotation identifies the deliverables, assumptions, agreed programme and any supporting design risk information required for the scheme.
If additional mapping or OS data needs to be purchased, the cost is agreed by email first. Site visits are available on request.
Let us know your drawing deadline as well as the works dates. Urgent requests are subject to availability; any short-turnaround or out-of-hours uplift is agreed before acceptance.
Temporary signals
A junction layout showing four-way temporary traffic signals, a temporary pedestrian crossing, advance signing and the proposed work area. The staging information illustrates how the movements are presented on the drawing.

Reading this example
The layout brings the four signal-controlled approaches into one view, including where traffic waits and how each approach is signed.
Temporary pedestrian signals and the crossing position are shown alongside the vehicle arrangement, allowing the movements to be reviewed together.
A staging diagram and timing table accompany the plan. They explain the arrangement shown in this example; another site needs its own review.
Illustrative examples with title blocks removed. These extracts are not for site use.
Before you enquire
Start with the location, the work you need to carry out and the space required. We will review that information with you and agree the design brief before preparing the drawing.
Yes. Tell us about footways, crossings, entrances and any access that needs to remain available. These requirements are considered alongside the traffic arrangement and the available space.
No. Include the speed limit if you know it. If it is not supplied, we will establish the road speed from reliable sources as part of developing the brief.
Yes, including two-way and multi-way layouts. Share the junction or road location, working area, affected accesses and any requirements already raised by the relevant authority. We will confirm the scope and supporting information needed.
Send the location, a short brief and your dates. We’ll confirm the scope, fee and drawing delivery date before work starts.